Ostwal Paradise Building No.9 Wing A - B - C
A residential / group housing project by Shree Ostwal Builders Ltd in MIRA ROAD EAST, Thane.
Data as of Jul 2026, from this project's public MahaRERA filing. View on the MahaRERA portal ↗
Status & progress
Per MahaRERA record as of Jul 2026.
Project basics
As filed with MahaRERA — not analysis, just the record.
- Promoter
- Shree Ostwal Builders Ltd · Company
- Project type
- Residential / Group Housing
- Land area
- 2,560 m² · Permissible built-up (FSI) 13,520 m²
- Total units
- 194 across 3 wings
- Estimated cost
- ₹65.3 Cr
- Land ownership
- Promoter is the landowner
- Parking
- 122 four-wheeler · 66 two-wheeler
- Application date
- 26 Jul 2022
3 wings
Floors and unit counts as filed.
| Wing | Floors sanctioned | Total units |
|---|---|---|
| NA | 25 of 25 proposed | 81 |
| NA | 24 of 24 proposed | 36 |
| NA | 24 of 24 proposed | 77 |
Promoter & professionals
Names and registrations as declared — no background analysis.
- Architect
- AMIT KUMAR JHA · CA/2018/91528
- Structural engineer
- PRO-TECH CONSULTANTS · STR/D/114.(STR:840014721)
- Project bank
- INDUSIND BANK
Where it sits
MIRA ROAD EAST, Thane — 401107.
0 red flags in 9 checks
The full report shows what each check looked at in this project's record. Absence of a flag reflects the record as filed, not an assessment of safety.
- Registration status3 checks, none raised
- Complaints & recovery warrants2 checks, none raised
- Litigation & encumbrance disclosure2 checks, none raised
- Sales & cost filings2 checks, none raised
What to verify before you pay a booking amount
Questions for the promoter and documents to ask for, each drawn from this project's record.
Unlock the checklist for this project, with the record entry behind each step.
Unlock full report — ₹99Litigation & charges
Unlock the complaint list with order and warrant detail, plus full encumbrance and litigation detail and the FAQ.
Unlock full report — ₹99Ostwal Paradise Building No.9 Wing A - B - C: common questions
Is Ostwal Paradise Building No.9 Wing A - B - C RERA registered?
Yes. Ostwal Paradise Building No.9 Wing A - B - C is registered with MahaRERA under registration number P51700048041, granted on 7 December 2022. As of July 2026, the registration is active.
What is the possession date of Ostwal Paradise Building No.9 Wing A - B - C?
The developer has declared completion by December 2028 in its MahaRERA filing. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.
Who is the builder of Ostwal Paradise Building No.9 Wing A - B - C?
Ostwal Paradise Building No.9 Wing A - B - C is developed by Shree Ostwal Builders Ltd, the promoter named in its MahaRERA registration.
Where is Ostwal Paradise Building No.9 Wing A - B - C located?
Ostwal Paradise Building No.9 Wing A - B - C is in Mira Road East, Thane (PIN 401107), Maharashtra, as declared in its RERA registration.
How many units does Ostwal Paradise Building No.9 Wing A - B - C have, and how many are sold?
Ostwal Paradise Building No.9 Wing A - B - C has 194 units on its RERA registration. 137 were reported sold as of July 2026, leaving 57 unsold.
How much construction of Ostwal Paradise Building No.9 Wing A - B - C is complete?
By the developer's own quarterly filing, 58% of the work is done, measured against the project's cost estimate.
Is there any litigation against Ostwal Paradise Building No.9 Wing A - B - C?
2 litigation cases are declared on Ostwal Paradise Building No.9 Wing A - B - C's MahaRERA record. The full report lists each case with its court and status.
More RERA projects in Mira Road East
- Urban Reserve Wing B · Thane
- Codename Endgame – Tower 1 · Thane
- Codename Endgame – Tower 2 · Thane
- Imperial Heights Phase III - E Wing · Thane
- Ramdev Avighna Sky · Thane
- Benevolent MB Heights · Thane
- Unique Estate - II · Thane
- Shubharambh · Thane
Other projects by Shree Ostwal Builders Ltd
- Ostwal Horizon · Thane
- Ostwal Akaasha · Thane
- Ostwal Gala Kunj · Mumbai Suburban
- Ostwal Mansion · Thane