ActivePR1331012502120Registered Jan 20260 red flags in 9 checks

Kohinoor Uptown T7

A residential / group housing project by Kgi Realty Private Limited in Near Bardi Petroleum, Thane.

Data as of Jul 2026, from this project's public MahaRERA filing. View on the MahaRERA portal ↗

Overview

Status & progress

Per MahaRERA record as of Jul 2026.

Construction
0%
cost-weighted
Declared completion
Dec 2028
no delay on record
Units sold
1 / 189
1% sell-through
Basics

Project basics

As filed with MahaRERA — not analysis, just the record.

Promoter
Kgi Realty Private Limited · Company
Project type
Residential / Group Housing
Land area
33,335 m² · Permissible built-up (FSI) 9,633 m²
Total units
189 across 1 wing
Estimated cost
₹24.1 Cr
Parking
105 four-wheeler · 77 two-wheeler
Application date
21 Nov 2025
Buildings & units

1 wing

Floors and unit counts as filed.

WingFloors sanctionedTotal units
NA17 of 17 proposed189
People on record

Promoter & professionals

Names and registrations as declared — no background analysis.

Architect
PRASHANT R CHAVAN · CA/98/22610
Structural engineer
Atesh Pralhad Jadhav
Project bank
ICICI BANK LIMITED
Location

Where it sits

Near Bardi Petroleum, Thane — 421302.

Locality
Near Bardi Petroleum
District
Thane
Authority
DIRECTORATE OF TOWN PLANNING AND VALUATION, THANE
Red flags

0 red flags in 9 checks

The full report shows what each check looked at in this project's record. Absence of a flag reflects the record as filed, not an assessment of safety.

  • Registration status3 checks, none raised
  • Complaints & recovery warrants2 checks, none raised
  • Litigation & encumbrance disclosure2 checks, none raised
  • Sales & cost filings2 checks, none raised
What to verify

What to verify before you pay a booking amount

Questions for the promoter and documents to ask for, each drawn from this project's record.

1
commencement certificate on file
4
professionals declared

Unlock the checklist for this project, with the record entry behind each step.

Unlock full report — ₹99

Kohinoor Uptown T7: common questions

Is Kohinoor Uptown T7 RERA registered?

Yes. Kohinoor Uptown T7 is registered with MahaRERA under registration number PR1331012502120, granted on 20 January 2026. As of July 2026, the registration is active.

What is the possession date of Kohinoor Uptown T7?

The developer has declared completion by December 2028 in its MahaRERA filing. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.

Who is the builder of Kohinoor Uptown T7?

Kohinoor Uptown T7 is developed by Kgi Realty Private Limited, the promoter named in its MahaRERA registration.

Where is Kohinoor Uptown T7 located?

Kohinoor Uptown T7 is in Thane (PIN 421302), Maharashtra, as declared in its RERA registration.

How many units does Kohinoor Uptown T7 have, and how many are sold?

Kohinoor Uptown T7 has 189 units on its RERA registration. 1 were reported sold as of July 2026, leaving 188 unsold.

How much construction of Kohinoor Uptown T7 is complete?

By the developer's own quarterly filing, 0% of the work is done, measured against the project's cost estimate.

Is there any litigation against Kohinoor Uptown T7?

No litigation is declared on Kohinoor Uptown T7's MahaRERA record as of July 2026. A clean record reflects what was filed, not a legal title check.

RERA projects nearby

Other projects by Kgi Realty Private Limited

All projects by Kgi Realty Private Limited →