Status & progress

Per MahaRERA record as of Jul 2026.

Construction
0%
cost-weighted
Declared completion
Dec 2029
no delay on record
Units sold
0 / 32
0% sell-through
Basics

Project basics

As filed with MahaRERA — not analysis, just the record.

Promoter
Eterna Lifespace LLP · Limited Liability Partnership
Project type
Residential / Group Housing
Land area
418 m² · Permissible built-up (FSI) 2,216 m²
Total units
32 across 1 wing
Estimated cost
₹11 Cr
Parking
44 four-wheeler · 0 two-wheeler
Held outside open sale
16 rehab
Application date
07 Jan 2026
Buildings & units

1 wing

Floors and unit counts as filed.

WingFloors sanctionedTotal units
NA20 of 20 proposed32
People on record

Promoter & professionals

Names and registrations as declared — no background analysis.

Architect
· CA/98/23034
Structural engineer
N.D. Rathod & Associates
Project bank
BANK OF MAHARASHTRA
Location

Where it sits

Dadar (West), Mumbai City — 400028.

Locality
Dadar (West)
District
Mumbai City
Authority
P-15917/2023)/G/North/FP/CC/1/New
Red flags

0 red flags in 9 checks

The full report shows what each check looked at in this project's record. Absence of a flag reflects the record as filed, not an assessment of safety.

  • Registration status3 checks, none raised
  • Complaints & recovery warrants2 checks, none raised
  • Litigation & encumbrance disclosure2 checks, none raised
  • Sales & cost filings2 checks, none raised
What to verify

What to verify before you pay a booking amount

Questions for the promoter and documents to ask for, each drawn from this project's record.

1
commencement certificate on file
3
professionals declared

Unlock the checklist for this project, with the record entry behind each step.

Unlock full report — ₹99

Eterna 275: common questions

Is Eterna 275 RERA registered?

Yes. Eterna 275 is registered with MahaRERA under registration number PR1170002502534, granted on 2 March 2026. As of July 2026, the registration is active.

What is the possession date of Eterna 275?

The developer has declared completion by December 2029 in its MahaRERA filing. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.

Who is the builder of Eterna 275?

Eterna 275 is developed by Eterna Lifespace LLP, the promoter named in its MahaRERA registration.

Where is Eterna 275 located?

Eterna 275 is in Dadar West, Mumbai (PIN 400028), Maharashtra, as declared in its RERA registration.

How many units does Eterna 275 have, and how many are sold?

Eterna 275 has 32 units on its RERA registration. 0 were reported sold as of July 2026, leaving 32 unsold.

How much construction of Eterna 275 is complete?

By the developer's own quarterly filing, 0% of the work is done, measured against the project's cost estimate.

Is there any litigation against Eterna 275?

No litigation is declared on Eterna 275's MahaRERA record as of July 2026. A clean record reflects what was filed, not a legal title check.